Decommissioning and Remediation

SiteCare has been responsible for the demolition and removal of components and surfaces within the fuel industry for the past 5 years . This includes the removal of all redundant fuels/services pipework and electrical cables/conduit encountered during the demolition/excavation process. All items removed are appropriately disposed of in accordance with the client/national standards and the Waste Management Plan (WMP).

Sitecare provide all necessary documents in accordance with client/regulatory Standards and consent requirements to cover the disposal of items and materials removed from the work site.

SiteCare develop detailed demolition plans which are submitted for client approval to ensure client/regulatory requirements are met. The demolition plan includes, but is not limited to, the following key areas:

 

Deconstruction Planning & Sequencing

  • Planning
  • Safety in design
  • Deconstruction methodology & equipment proposed
  • Personnel training & qualifications

 

Safety Measures

  • Asbestos testing & removal procedure
  • Specific demolition safety management plan
  • Security

 

Environmental Effects

  • Dust suppression
  • Erosion & sediment control
  • Noise control
  • Stormwater
  • Lighting
  • Reduce, reuse, recycle
  • Stockpiling

 

Public Interfaces

  • Traffic management (on and off-site movements)
  • Pedestrian safety & control
  • Affected parties
  • Public information & neighbour notification

 

Legislative Requirements

  • Additional consents, monitoring or approvals required